Comet pulls a folded page from the back of the SH-1 packet. "A timeline of how SH-1 was made!" she says. "Look, testing comes last, right before a school starts using it."
Wren reads the page twice. "What does the evidence say? If they only test at the end, what if the problem started at the beginning?"
Comet chews her pencil. "Then they would have built the whole thing on a mistake."
Nova projects a long arrow across the library wall, with four empty boxes along it. "Would you like a hint?" she asks. "Put each step in a box, then look for who checks the work."
Librarian Joss sets down a cup of pencils. "Reviewer, can you put SH-1's story in order?"
AI actors are the people and organizations who play an active role in an AI system's lifecycle. That includes the people who deploy or run it.
For SH-1, the builder is an AI actor. So are the base model maker, Harbor Point's teachers and the crew.
The SH-1 timeline below is a made-up example from the packet. The stage names come from NIST.
Design work happens first: the setting, the data and the inputs.
Development work builds the model. Deployment work puts the system to its task and its outputs into use.
Operation and monitoring work runs the system and keeps checking it.
Testing, evaluation, verification and validation, called TEVV, happen all the way through. Risk management should start with planning and design.
| Stage | SH-1 timeline (made up for the story) |
|---|---|
| Design | The builder wrote down SH-1's goals and gathered study material. |
| Development | The builder tuned the base model on that study material. |
| Deployment | Harbor Point would pilot SH-1 in a few classes. |
| Operation and monitoring | Teachers would run SH-1 and check its outputs every week. |
| TEVV (all the way through) | Tests at every stage, including the crew's own tests. |
| Statement | True or false? |
|---|---|
| AI actors include people who deploy or run an AI system. | ? |
| Development work builds the model. | ? |
| TEVV happens only once, at the very end. | ? |
| Risk management should start with planning and design. | ? |
| The SH-1 timeline is a real company's timeline. | ? |
Strong start to week two, reviewer. Tomorrow the crew meets the people who do each job.